Ask what an ADU costs and most websites hand you a construction range and stop. The real bill comes in three parts: what the city charges, what the water and sewer district charges, and what the builder charges. The first two are the ones people forget, and they swing the most. The same 500 sq ft detached ADU can owe almost nothing in government fees or more than $40,000, depending on the district and the build type. Here is each bill, itemized. The original fee research dates to August 2026. Hayward and Union Sanitary were rechecked on October 7, 2026; their effective dates and project conditions are below. Other figures have not been re-audited in this update.

Thesis

ADU money comes in three separate bills: the city's, the water district's, and the builder's. Most articles cover only the third, but the first two can differ by over $40,000 depending on your district and your build type.

Adam's Angle

I do not build ADUs. This October 7, 2026 update rechecks Hayward and Union Sanitary charges and their scope; other figures retain their original research dates.

You might be wondering

If any of these sound like you, this guide was written for you.

  • How much does it cost to build an ADU in the East Bay?
  • What government fees apply to an ADU?
  • Is a garage conversion cheaper than a detached ADU?
  • What does ADU construction cost per square foot?
  • How much will an ADU raise my property taxes?

How many separate bills does an ADU involve?

Three, each collected by someone different. The city takes permit and plan-check fees, plus development impact fees if it charges them. The water and sewer district — often not your city, with boundaries that ignore city lines — takes connection and capacity charges. The builder takes design, construction, and materials.

Most blown budgets are not construction overruns. They are the first two bills never being counted at all.

Correction, November 8, 2026: earlier versions said a new detached ADU has needed solar panels since January 1, 2026. That is the date the 2025 Energy Code took effect; the same solar requirement was already in the 2022 Energy Code, so the date has been removed. Earlier versions also said only the space over 500 sq ft pays school fees and called $5.38 per square foot the cap. Under Education Code 17620, an ADU over 500 sq ft may be charged on its whole new area, and $5.38 is the State Allocation Board's maximum Level I fee; Level II and III fees can be higher. Earlier versions also said every conversion counts as an addition; the Energy Commission treats converting space that is already heated or cooled as an alteration, which the solar rule does not cover either. The separate utility connection rule now names its exceptions. Earlier versions also gave a $110,000 to $280,000 range for builder quotes with no source behind it; it has been removed. The city impact fee table now cites each city's own document, gives the dates of San Leandro's and Oakland's actions, and compares each waiver with what a new home pays instead of calling it a saving. Earlier versions also said all five cities waive local impact fees at any size; Oakland and San Leandro exempt only named fees, Berkeley's statement covers its planning division, and Fremont's code is narrower than its handout. Oakland's date is now given as the ordinance's adoption date.

How much does the 750 sq ft exemption actually save?

State law waives development impact fees on any ADU of 750 sq ft or less. That is real money — but it covers only one of the three bills.

The very next paragraph of the same law, section 66311.5(c)(2), says an impact fee "does not include any connection fee or capacity charge." So a 400 sq ft detached ADU can owe zero impact fees and still owe a full sewer capacity charge. Two agencies, two bills.

What do the districts charge to connect?

This is the least-written-about bill and the one that swings hardest. Find out which district bills your address first, then read the table.

Hayward’s figures are separate applicable line items, not a flat total for every ADU. The city utility checklist distinguishes conversions of permitted space adding no more than 150 sq ft from new construction or larger additions; keeping a shared meter can still require upsizing. Its old dollar examples are outdated, so this table uses the current fee schedule. Service installation, meter work, permits, and other charges are additional; the city determines the final charges during plan review.

Union Sanitary adopted Ordinance 35.24 on July 27, 2026. Exhibit A labels its columns by calendar year, effective October 1: $6.46/sq ft in 2026 and $6.60 in 2027. The webpage’s fiscal-year wording is confusing; this table follows the signed ordinance. It charges detached ADUs and ADUs expanding the primary residence by more than 150 sq ft. It exempts ADUs within an existing single-family home’s living area or expanding the existing residential structure by no more than 150 sq ft. Confirm the project classification and written charge with the district.

Connection and capacity charges: Hayward and Union Sanitary rechecked October 7, 2026; EBMUD retains original research
DistrictConversion (existing meter)New detached (new service)
EBMUD water + wastewater (Oakland, Berkeley, Alameda...)$0$19,527 + $3,768 per new meter
City of HaywardProject review; meter upsizing may apply$5,825 ADU sewer capacity; $8,631 water facilities for a 5/8-inch meter (effective Sept 1, 2026, where applicable)
Union Sanitary (Fremont, Newark, Union City)$0 for qualifying existing-space exemptions$6.46/sq ft from Oct 1, 2026 (Ordinance 35.24, Exhibit A)

EBMUD bills per new water meter, so no new meter means neither charge. Union Sanitary's own ordinance exempts ADUs inside existing living area or expanding by no more than 150 sq ft. DSRSD (Dublin) and Central San price by meter size and discharge, not square footage — ask them directly.

Which cities waive impact fees?

Five East Bay cities go beyond the state floor on their own impact fees. I checked each one against the city's own code, resolution, fee schedule or ADU handout. This is money most homeowners never know they are not paying.

City impact fees on an ADU, checked against each city's own documents
CityLocal impact fees on an ADUSource, and what a new home pays
FremontNone, regardless of size, per the city's ADU handout (updated October 20, 2026)A new 2-bedroom home pays about $33,700 in development impact fees, before affordable housing fees. The code wording is narrower, so get a detached ADU confirmed in writing
OaklandExempt at any size from the affordable housing, transportation and capital improvements feesMunicipal Code 15.72.040 and 15.74.040, as amended by Ordinance 13853 (July 15, 2025)
BerkeleyNone from Land Use PlanningCity ADU information sheet, August 20, 2026. Berkeley Unified charges school fees over 500 sq ft
San Leandro$0 park fees and $0 street improvement fees, at any sizeResolutions 2025-106 and 2025-107, adopted July 21, 2025
City of Alameda$0 impact fees, and exempt from the 1% Improvement TaxFY 2026-27 fee schedule. A new single-family home pays $17,340 in citywide impact fees (not Alameda Point), plus the tax

The state floor: any ADU of 750 sq ft or less pays no impact fees (Gov. Code 66311.5(c)(1)). The cities above go further. I checked each row on November 8, 2026 against the city's own code, resolution, fee schedule or ADU handout. School district fees, permit and plan-check fees, and water and sewer charges are separate everywhere.

Where does the garage-conversion discount really come from?

Not from the construction quote. Three requirements attach only to new detached construction.

Solar: under the state Energy Code, a new detached ADU needs photovoltaic panels unless an exception applies, for example when the required system would be smaller than 1.8 kWdc; a conversion counts as an addition or an alteration and does not. A separate utility connection: a unit built inside existing space cannot be required to install one, unless it is built with a new house or the ADU is sold separately; new construction can. Capacity charges: no new meter means none of EBMUD's $23,295 — the largest single number in this article.

So before any drawings, answer one question: is the existing meter enough? That answer is worth about twenty thousand dollars.

What does construction cost per square foot?

Honestly: there is no reliable per-square-foot number. The only independent survey, from Berkeley's Terner Center in 2021, found a statewide median of $150,000, roughly $250 per square foot. It is five years old and predates the Bay Area's recent cost inflation.

I found no current, independent East Bay figure to put next to it, and a builder's advertised price is a sales number, not data. Do not budget off a website's number, including this one. Get three bids on the same plans and let them argue with each other.

Leave room for soft costs too: design and structural engineering commonly add $20,000 to $30,000.

What other costs get missed?

The sewer lateral. In Oakland, Alameda, and other East Bay cities, construction valued over $100,000 triggers a lateral compliance certificate — $407 itself, but replacing an old lateral routinely runs five figures. Almost every new detached build crosses that line.

School fees. An ADU under 500 sq ft is exempt (Gov. Code 66311.5(c)(3)). A larger ADU may be charged on its whole new area, not just the part above 500 sq ft (Education Code 17620). The State Allocation Board set the maximum Level I fee at $5.38 per square foot in January 2026; a district that qualifies for Level II or III fees can charge more. The school district bills it, and no city can waive it.

Permit and plan-check fees. Every city charges these, usually a few thousand dollars, separate from impact fees.

How much will an ADU raise my property taxes?

Only by the new part. The Alameda County Assessor is explicit: just the newly built portion is assessed at market value, and your existing home keeps its Proposition 13 base year value. Completion triggers a one-time supplemental bill, prorated from the finish date.

No assessor publishes a formula for what an ADU adds. Anyone quoting you a precise number is guessing.

Adam's takeaway

Ask for the three bills separately: the city's written fee list, the district's written connection quote, and three comparable construction bids. Only with all three papers on the table is your budget real.

The biggest savings decisions are not finishes. They are two early questions: does your city waive impact fees, and is your existing water meter enough? Get both answers before the first drawing.

The two revised district entries now state effective dates and applicability. Get a written fee determination and reconfirm every other budget item before construction.

Free parcel check

Want to know what these rules mean for your exact property?

Send me your address. I will reply with which water and sewer district actually bills you, whether your city's rules are current or overridden by state law, and the fees that would realistically apply. No obligation, and you will know more than most counters will tell you.